Safety precautions for maintenance
1: Before equipment maintenance, clean the equipment and pipeline, close the inlet and outlet valves of the hot oil pump or plug the blind plate, and isolate from the system.
After passing the inspection and delivery procedures.
2: The power supply must be cut off before the equipment maintenance. After the review, the "Prohibit Card" sign must be hung at the power supply before the maintenance can begin.
3: maintenance tools, disassembly, cleaning, replacement of parts, to be placed in the specified place, placed neatly, do civilized construction
4: safety precautions for test run
5: The test run shall be carried out under the unified command by a special person.
6: Special person is responsible for the operation of the opening and parking. The operator should hold the "Safe Operation Certificate" of the post.
7: Set up obvious test marks and prohibit irrelevant personnel from entering the test site.
8: Before the test run, check whether the rotation direction of the drive motor is correct. After the correct rotation direction, connect the coupling and install the protective cover before the test run.
9: Strictly follow the pump starting procedure.
10: During the test run, pay attention to whether the operation of the pump is normal. If abnormal vibration and sound are found, or the current exceeds the rated value, the pump shall be stopped immediately for inspection and treatment, and the test run shall be conducted after elimination.
For more information的内容
上一篇:没有了 下一篇:Hot oil pump bearing
TEL:0317-8296807 FAX:0317-8181816 Email:kemaiind@outlook.com
Quick Menu:China Oil Pumps | Pumps and Couplings Manufacturer In China | Oil Transfer Pumps