Stainless steel self-priming oil pump three installation steps:
First connect the inlet pipe, do not leak, release the material pool, the following sealing after the liquid material from the discharge mouth into the outside, after filling, connected to the discharge pipe requirements tight, and so on when the motor runs can be supplied.
1, when connected to the power supply, we should pay attention to the direction of motor rotation, to turn smoothly, reverse can not absorb material.
2. When using, it is necessary to fill the feeding pipe and Haina stainless steel self-priming oil pump to start, otherwise the form of vacuum can not absorb material.
3, suction inlet pipe application is not subjected to pump force suction flat rubber and plastic hose (fixed installation can be hard pipe) material pump inlet connection with a short pipe expansion method in the live joint, then matched with the appropriate rubber pipe sleeve, the discharge mouth is also used in the same connection, in order to meet the head, in the sleeve section shall not increase or decrease.